Our company carried out an internal magnetic leakage test on a long-distance pipeline of CNOOC

2025-02-25

In May 2023, our company conducted MFL internal inspection on a 457mm, 162km long pipeline of CNOOC, including pig detection, deformation detection, MFL internal inspection, data analysis, multiple rounds of internal inspection data alignment, integrity evaluation and other work contents.